1 level of cellar, 1 stilt, and 5 upper floors of RCC framed structure.
8″ thick solid / AAC Bricks / Red Bricks Brickwork for external walls & 4″ thick solid / AAC / Red Bricks Brickwork for internal walls
Internal walls: Two coats of cement plastering with sponge finish.
External walls: Two coats of cement plastering with sponge finish.
Main Door: Teak wood / Hardwood frame with flush shutter polished over veneer on both sides and fitted with SS Hardware of best Brands.
Internal Door: Engineered wood / Hardwood frame with flush shutter brand.
UPVC windows with provision of mosquito mesh of reputed make MS grills with enamel paint finish
External: Birla/Asian putty/texture and Asian ultima paint
Internal: Birla/Asian putty and plastic emulsion paint
Ceramic tile dado upto 2’ height above platform in kitchen ceramic tile dado upto 7’ height in bathroom tile dado upto 3’ height in utilities
Automatic lift of kone brand
Surveillance cameras at the main gate, corridor and parking
March 2023
Attapur, Hyderabad
GV Associates
EElements Creative